  • On Monday our group went to swimming pool to mount and adjust the timer,we also went to P2 to maintain the transformer ,we isolated the fuses using a lean stick we where instructed by Mr Lebese.
Tuesday

  • At 08h30 we started by taking out a network cable,then we pulled it under the tunnel using a draw wire.We finished our task at 15h30 we where instructed by Mr Etian.

13-14 july 2009

Friday, July 10, 2009

10 july 2009

  • we digged another trench and burried a suffix cable at Sehwale.

09 july 2009

  • At 08h30 my group was ordered to disconnect the overhead line suffix cable to make it underground cable,we started by digging a 12m trench,disconnect and isolate the cable make a joint after that we buried the cable, connect the supply and test for voltage,we finished the job at 11h30,the job was instructed to us by Mr Etian.

Wednesday, July 8, 2009

7-8 july 2009

  • On the 7 of July 2009 our Electrical Team was send to Sehwale to dig a trench for the exposed cables.After that we mounted 4 speakers at Guest House instructed by Mr Etian,We also started a new fundamental module called Measure,Estimate and Calculate Physical Quantities with Miss Heidi.
  • On the 8 of July 2009 our team completed to connected the speakers at Quest House,after that we maintained the lighting system at Mr van Rensberg House instructed by Mr Lebese.We continued with our fundamentals module.

Friday, July 3, 2009

23-25 june 2009

  • On the 23-25 of june 2009 we did the fundamentals manual called use Mathematics in Finance with our facillitator Miss Heidi.
  • On the 29-30 of june 2009 we were assessed on all the manuals that we have done by Mr RS Haggeman and Mr P Nolter from the Protech Trainning.
  • On the 01 july 2009 our group installed 7 garden lights at the Guest House using suffix cable instructed by Mr Etian.
  • On the 02 july 2009 our group installed 5 infrared lights at wild life centre for the sick animals and installed 3 plugs at mechanical work shop instructed by Mr Etian.